| KOMISJA NADZORU FINANSOWEGO | |||||||||||
| Raport bieżący nr | 36 | / | 2017 | ||||||||
| Data sporządzenia: | 2017-06-22 | ||||||||||
| Skrócona nazwa emitenta | |||||||||||
| CEZ, a.s. | |||||||||||
| Temat | |||||||||||
| CEZ Group continues to invest in German wind power, its total installed capacity in Germany has now reached nearly 135 MW | |||||||||||
| Podstawa prawna | |||||||||||
| Art. 56 ust. 1 pkt 2 Ustawy o ofercie - informacje bieżące i okresowe | |||||||||||
| Treść raportu: | |||||||||||
| CEZ Group has taken over the operational onshore wind farm Lettweiler Höhe in Germany, with a total installed capacity of 35.4 MW. All of the turbines, located near Rehborn in a single location in the German state of Rhineland-Palatinate, are in operation. The contract with the seller, the well-reputed KGAL Asset and Investment Manager, foresees support in the form of a guaranteed feed-in tariff over 20 years. see file to download | |||||||||||
| Załączniki | |||||||||||
| Plik | Opis | ||||||||||
| CEZ-036-2017_EN.pdf | |||||||||||
| MESSAGE (ENGLISH VERSION) | |||
| CEZ, a.s. | |||||||||||||
| (pełna nazwa emitenta) | |||||||||||||
| CEZ, a.s. | Przemysł inne (pin) | ||||||||||||
| (skrócona nazwa emitenta) | (sektor wg. klasyfikacji GPW w W-wie) | ||||||||||||
| 140-53 | Praha | ||||||||||||
| (kod pocztowy) | (miejscowość) | ||||||||||||
| Duhova | 2/1444 | ||||||||||||
| (ulica) | (numer) | ||||||||||||
| (telefon) | (fax) | ||||||||||||
| (e-mail) | (www) | ||||||||||||
| CZ45274649 | 45274649 | ||||||||||||
| (NIP) | (REGON) | ||||||||||||
| PODPISY OSÓB REPREZENTUJĄCYCH SPÓŁKĘ | |||||
| Data | Imię i Nazwisko | Stanowisko/Funkcja | Podpis | ||